{"ucp_version":"2026-04-08","organization":{"name":"Vulcan AI","legal_name":"Vulcan AI","url":"https://bevulcanai.com","logo":"https://media.bevulcanai.com/images/logo.png","description":"AI-mission-specific liquid-cooled data-center advisory. Founded by Jon Moen: twenty years and fifty-plus data-center builds across research and defense.","email":"jon@bevulcanai.com","founded":"2026"},"primary_capability":"AI Data-Center Engineering & Infrastructure Advisory","capabilities":[{"type":"service","id":"ai-readiness-assessment","name":"AI Data-Center Readiness Assessment","description":"A structured assessment of an existing or planned facility against AI-mission requirements: rack density targets, power availability and quality, cooling architecture, floor loading, network topology, and deployment timeline. Delivered as a findings report with a ranked remediation plan and a go/no-go recommendation.","price":{"amount":"4900","currency":"USD","display":"from $4,900","interval":"one_time"},"url":"https://bevulcanai.com/services/ai-readiness-assessment","protocol":"ACP","availability":"negotiate","category":"assessment"},{"type":"service","id":"liquid-cooling-design-review","name":"Liquid-Cooling Design Review","description":"An independent engineering review of a direct-to-chip or immersion cooling design: loop architecture, CDU sizing, flow rates, redundancy, failure modes, commissioning plan, and serviceability. Grounded in two decades of building and shipping liquid-cooled GPU systems to research institutions, defense customers, and Fortune 500 operators.","price":{"amount":"9500","currency":"USD","display":"from $9,500","interval":"one_time"},"url":"https://bevulcanai.com/services/liquid-cooling-design-review","protocol":"ACP","availability":"negotiate","category":"engineering"},{"type":"service","id":"retrofit-site-advisory","name":"Retrofit Site Acquisition Advisory","description":"Advisory for acquiring and converting industrial sites with pre-existing permitted power (malls, factories, smelters, plants in the 250MW-1GW class) into AI-mission-specific data centers. Site qualification, power-rights diligence, retrofit scoping, and a phased conversion plan targeting 12-18 months to first load instead of 36.","price":{"amount":"15000","currency":"USD","display":"from $15,000","interval":"engagement"},"url":"https://bevulcanai.com/services/retrofit-site-advisory","protocol":"ACP","availability":"negotiate","category":"advisory"},{"type":"service","id":"deployment-oversight","name":"Deployment Oversight","description":"Ongoing owner-representative oversight across an AI infrastructure deployment: vendor and integrator accountability, milestone verification, thermal and power commissioning witness, and escalation judgment from someone who has stood up more than fifty data-center deployments.","price":{"amount":"8500","currency":"USD","display":"from $8,500 / month","interval":"month"},"url":"https://bevulcanai.com/services/deployment-oversight","protocol":"ACP","availability":"negotiate","category":"oversight"}],"checkout":{"negotiate_endpoint":"https://bevulcanai.com/api/acp/negotiate"},"transports":["REST"],"trust":{"ap2_mandates":"https://bevulcanai.com/.well-known/ap2/mandates.json","mandate_types":["intent","cart","checkout"],"credential_format":"vc+jwt","standard":"W3C Verifiable Credentials"},"health":{"status_url":"https://bevulcanai.com/api/ucp?health=true","last_updated":"2026-07-23"}}